Switching between projects - usage of open recent menu

Hi,

every time I switch the project I am afraid to choose the wrong one and loose some configuration settings. That could probably happen if I would choose a project from previous version of Datagrip. I am wondering if there is a more robust method to switch between recent projects?

 

Here is the pic from recent projects:

 

And snapshot from recent project manager:

0

Please sign in to leave a comment.