Perforce sync?

Hi!

Am I mising somethiong or isn't it possible to sync files from Perforce? When I have set up my project to use Perforce I'm able to perform most operations, edit, submit, browse changes etc. But I can't se how I'm supposed to do when I want to sync with the repository.
I can of course do this using external tools.

I'm testing using Irida build 3417.

Anybody out there that know how to do this?

/Thomas

3 comments
Comment actions Permalink

Update action does perforce sync

"Thomas Sundberg" <tsu@kth.se> wrote in message
news:22010840.1121932768579.JavaMail.javamailuser@localhost...

Hi!

>

Am I mising somethiong or isn't it possible to sync files from Perforce?
When I have set up my project to use Perforce I'm able to perform most
operations, edit, submit, browse changes etc. But I can't se how I'm
supposed to do when I want to sync with the repository.
I can of course do this using external tools.

>

I'm testing using Irida build 3417.

>

Anybody out there that know how to do this?

>

/Thomas



0
Comment actions Permalink

So that would be Ctrl+T (Update project)
-


Maxim Shafirov
http://www.jetbrains.com
"Develop with pleasure!"


0
Comment actions Permalink

Maxim Shafirov (JetBrains) wrote:

So that would be Ctrl+T (Update project)


This makes me wonder if it wouldn't be better for each VCS plugin to
define it's own menu actions and terminology, to avoid this sort of
confusion.

There must be a way to design the API for general VCS integration with
the IDE while retaining the specific flavour and/or special operations
of the chosen VCS.

Ciao,
Gordon

--
Gordon Tyler (Software Developer)
Quest Software <http://www.quest.com/>
260 King Street East, Toronto, Ontario M5A 4L5, Canada
Voice: (416) 933-5046 | Fax: (416) 933-5001

0

Please sign in to leave a comment.