MetricsReloaded and a larger project

We have a ~5000 classes project and I invoked MetricsReloaded on it.
After recognizing that it seems to need 5-10 seconds for each class
(according to the progress text), I pressed the Cancel button. It took
approx. 5 minutes until the progress stopped.

Tom

2 comments
Comment actions Permalink

Thomas Singer (MoTJ) wrote:

We have a ~5000 classes project and I invoked MetricsReloaded on it.
After recognizing that it seems to need 5-10 seconds for each class
(according to the progress text), I pressed the Cancel button. It took
approx. 5 minutes until the progress stopped.

Tom


In my experience it never stops. Pressing cancel only makes it hide the
results when it's done.

0
Comment actions Permalink

I'll look into it. It should be checking for cancel after each file is processed.

--Dave Griffith

0

Please sign in to leave a comment.