MetricsReloaded and a larger project
We have a ~5000 classes project and I invoked MetricsReloaded on it.
After recognizing that it seems to need 5-10 seconds for each class
(according to the progress text), I pressed the Cancel button. It took
approx. 5 minutes until the progress stopped.
Tom
Please sign in to leave a comment.
Thomas Singer (MoTJ) wrote:
In my experience it never stops. Pressing cancel only makes it hide the
results when it's done.
I'll look into it. It should be checking for cancel after each file is processed.
--Dave Griffith